Skip to main content
Office moving

Office Moving in the Eastern Province: Relocating Over the Weekend and Opening on Sunday Ready

An office that moves on a working day loses hours of output, and an office that moves without order can lose files, cables and the patience of its staff. In the Eastern Province offices sit in commercial towers in Khobar and Dammam and in administrative buildings in Dhahran and Jubail, and the same questions keep returning: when do we move, how do we make sure every employee sits at the same desk setup as before, and what do we do with files, devices and cables? This page explains how to move a small or medium office: planning around the Friday and Saturday weekend, numbering workstations, protecting files, screens and printers, what the old and new buildings need from you and how to confirm on Sunday morning that everything is in place.

Office desks and furniture wrapped and moved along a corridor of an administrative building
Illustrative photoThe best office move is the one customers do not notice on Sunday
The goal

What does it mean to move an office without downtime?

The success of an office move is measured by one thing: when can staff sit down and work? It is not enough for furniture and devices to arrive; computers must be connected, printers working, phones and internet live and files back in their drawers. That needs more precise planning than a house move, because every hour of delay becomes stalled work and waiting clients.

So the move is built on a simple idea: we move at times when no work is going on, we control the movement with numbers and plans, and the staff have just one task, emptying their personal desk according to instructions given beforehand. The rest falls to an organised crew.

Plan for Friday and Saturday
Number every workstation
Disconnect and log cables
Test the network before Sunday

Types of office and what changes with each

The difference lies in the size of the job and the type of equipment.

Office typeMain contentsWhat deserves attention
Small, one or two roomsDesks, chairs, a cabinet and a PCOften done in a day; the challenge is devices and internet
Mid-size open planWorkstations, partitions and printersNumbering stations and partitions and routing cables
With a meeting roomLarge table, screens and audioDismantling big tables and protecting screens
With an archiveFile cabinets and paper boxesWeight, confidentiality and chronological order

The more precisely you describe the office in your request, the closer the estimate will be to reality.

The plan

Steps to organise an office move

Timing varies with size but the order is the same.

1

Appoint an office coordinator

One person speaks for the office to the moving crew and the new building and makes quick decisions.

2

Gather both buildings details

Entry and exit times, lift booking, loading entrance and any insurance requirements from building management.

3

Draw the new office plan

Where each desk, chair and cabinet goes and the workstation numbers, so pieces are set directly in place.

4

Ask staff to prepare their desks

Pack drawers into numbered cartons, separate personal from company items and leave no important papers on surfaces.

5

Arrange devices and cables

Photograph the back connections, number cables and ideally let a network technician disconnect and reconnect.

6

Moving day, then a Sunday check

Load, move and set up, then test network, phones and printers before staff arrive.

Timing

Why Friday and Saturday? And what if that is not possible?

The weekend in Saudi Arabia is Friday and Saturday, the best window to move an office because the building is quiet, lifts are less busy and staff are away. If your business runs all week, a night or late-hours move can be arranged within what building management allows. Moving during office hours is best avoided except for small items.

Keep the gap between closing the old office and opening the new one as short as possible. If it will be long, consider diverting the phone line, notifying clients of the new address or preparing staff to work remotely for a day or two.

Workstations

Numbering workstations: the secret behind an office running within an hour

The simplest and most powerful trick is to give each workstation a number: desk, chair, computer, monitor, mobile drawer unit, board. The number goes on every piece and on that stations cartons, with a matching number on the desk position in the new building. The worker arrives at desk 17 and puts the pieces numbered 17 in place without asking anyone.

This prevents confusion among the managers office, the accountant and reception, and cuts assembly time. It helps to use a colour per department so departments stand out on the plan.

Equipment

How office equipment is protected in transit

Office devices are costly and company data is worth more.

Desktop computers

Moved in original boxes if available or with shock-absorbing wrap, with the person responsible taking disks or a backup.

Monitors

Wrapped in bubble film, carried upright and placed where nothing presses on them.

Printers and scanners

Moving parts are secured, units move upright and are protected from dust.

Network gear and small servers

Handled by a network technician who photographs connections before disconnecting and rebuilds from the photos.

Phones and communication devices

Numbered with the desks and cables kept beside them in a numbered bag.

Boards and projectors

Wrapped and moved upright with fixings kept in a single bag.

Files

Files and archive: heavy, confidential and easy to lose

Paper archive is usually the heaviest thing in an office and the most dangerous when mixed up. Cabinets are not lifted full of files since they can be damaged or injure the people carrying them; files are first emptied into medium numbered boxes that keep their original order, and each box contents are listed. Confidential files are best moved under a responsible persons supervision who stays with them.

The cabinets themselves are emptied and moved upright with drawers taped shut so they do not open on the way. As for old archive you want to dispose of, consult your legal team first, since some papers have retention periods.

The building

The lift, the loading and building management: three parties to coordinate with

In commercial towers, movement is often controlled by building management: booking the service lift, permitted hours, a loading entrance or dock and sometimes names of workers or an insurance document. Ask the old and new buildings together and early, because some require notice days in advance and are not flexible on the day.

Measure the lift and the doors that long desks, file cabinets and the managers desk will pass through; they are what most often blocks. If floors are high, ask about alternative lifting solutions as the building allows, and we will confirm any arrangement for your request before the date.

Furniture

Desks, partitions and chairs: what is dismantled and what moves whole?

Much modern office furniture is already modular: desks with legs and panels, partitions fixed with screws and clips, cabinets with sliding drawers. Taking them apart, wrapping surfaces in bubble film and strapping linked parts saves space and reduces scratches, and everything is rebuilt per the plan. Chairs have their arms and wheels wrapped and move in groups by number.

For bespoke wooden office pieces such as the managers desk or large meeting table, it is wise for a carpenter to supervise dismantling and reassembly, and for the joining diagram to be photographed before taking apart. See our disassembly and reassembly guide for the numbering and documenting method.

Moving-day checklist: what to confirm before leaving the old office

One hour of checking prevents three days of chasing.

ItemHow to confirm
All workstations numbered and clearedA quick floor walk with the coordinator
Devices and cables wrapped and loggedA numbered list and connection photos
Files in numbered boxesA contents list for every box
Keys and access cards handed inA written note with the recipient name
Meeting rooms, stores and pantry emptyA check of every side room
Final condition photos of the old officeTo hand it over without dispute

After the crew leaves, check the old office one last time for something forgotten in a suspended ceiling or wall cupboard.

Day one

Sunday morning: how to confirm the office is ready

An hour before staff arrive, test the basics: electricity, air conditioning, internet, printers, phones, meeting-room displays and the entrance and security cards. Then check that each employee finds their desk, seat and drawer and can log in to their machine. A small note on each desk with name and drawer number helps.

Assign someone for quick support in the first days, since small problems appear: a missing cable, a screen that will not light up, a lost drawer key. Fixing them fast stops the first week from becoming chaos.

Cost

What decides the cost of an office move?

We do not publish figures because offices vary, but the factors are clear: the number of workstations and amount of furniture, the volume and weight of archive, the floors and whether there is a service lift, the distance between buildings, whether you need wrapping and dismantling, timing such as weekend or night, and whether you need a network or electrical technician coordinated.

Ask for a written quote that itemises each element, and send us the office plan or photos so the crew can size the job. The more detail before the date, the fewer surprises on the day.

Request

What should you send us to estimate your office move?

Send the city and rough addresses of both buildings, the number of floors, the number of workstations and staff, the archive volume, the meeting rooms and their contents, sensitive devices, any building insurance requirements or schedules, and the preferred time. Any plan or photos of the current office help.

Then contact us on WhatsApp or by phone, and we will explain the moving plan and provide a written quote that sets out what it covers.

FAQ

Frequently asked questions about office moves

Practical answers to what people ask before relocating.

When is the best time to move an office?
Usually the Friday and Saturday weekend, or at night as the building allows.
How do I make sure each employee finds their desk?
By numbering workstations and sticking the same number on pieces and on the desk position in the new building.
Who disconnects computers and the network?
Ideally a network technician, who photographs connections before disconnecting and rebuilds from the photos.
How are confidential files moved?
In numbered boxes under a responsible persons supervision, with a contents list and a check at handover.
Do I need permission from building management?
Usually yes: lift booking, move hours and sometimes worker details, so ask early.
Does the crew dismantle desks and partitions?
Yes, and everything is rebuilt according to the new plan with clear numbering.
Can part of the office move first?
Moving in phases by department is possible and we agree the schedule beforehand.
What helps you give an accurate quote?
Workstation count, archive volume, floors and lift, meeting rooms and photos of the office.

Moving your office soon?

Send us the number of workstations and the addresses of both buildings on WhatsApp or call us, and we will arrange an organised move with a written quote in the Eastern Province.